flexiblefullpage
interstitial1
Currently Reading

Airtight Deck Framing

Advertisement
billboard
Construction Practices

Airtight Deck Framing

Tightening this complex intersection of framing materials


By By Ben Bogie April 2, 2018
This article first appeared in the April 2018 issue of Pro Remodeler.

One of the leakiest parts of the house envelope is where the floor framing meets the foundation. On the Model ReModel (an annual project covered by ProRemodeler), we added air sealing to each step of the framing sequence.

[1] Air sealing begins with a sill seal gasket that serves as both an air seal and capillary break between the mudsill and the foundation. (Anchor bolts are not shown.)  

[2] With the mudsill in place, floor framing comes next. Whether rim joists are installed before or after the joists, they should be bedded in a bead of construction adhesive to seal the joint with the mudsill. Also apply adhesive at rim joist butt and corner joints.

[3] Make sure to use a continuous bead of construction adhesive at the perimeter when laying the subfloor. This is part of a belt-and-suspenders approach to air sealing the many joints created around the rim joist.

[4] Frame walls as usual, but bed the sole plate in a bead of sealant or adhesive to air seal the connection to the subfloor.

[5] Before installing wall sheathing, caulk all the joints between wall plates, subfloor, rim joist and mudsill using a flexible silicone or urethane sealant.

[6] He final step to air sealing the MRM house was to tape the seams in the ZIP System R-12 sheathing.

Find more Building Science here


written by

Ben Bogie

Ben Bogie is a second-generation custom builder and remodeler in New Milford, Conn. This article is adapted from a video made in conjunction with ProTradeCraft.com during construction of Professional Remodeler’s 2017 Model ReModel project.


Add new comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and email addresses turn into links automatically.
  • Lines and paragraphs break automatically.
leaderboard2

Related Stories

How to Weatherize Roof-Wall Intersections

Mitigating moisture between changes of materials and panes requires special attention

3 Steps for Installing House Wrap and a Rainscreen

ProTradeCraft's Building Resilience walks you through how to install a self-adhered house wrap, liquid flash obstructions, and top it off with a rainscreen

How to Insulate a Heated, Structural Slab with XPS

ProTradeCraft's Building Resilience season three starts with making a basement more comfortable

How to Retrofit Foundation Footings

To make a low-height basement a more comfortable living space, this remodeler digs deeper but needs to add support to do so

6 Must-Knows for Installing Pocket Doors

Save your sanity: Do it right the first time

Crawl Spaces to Basements: Proceed with Caution

Converting a crawl space to other uses can upgrade a home and add significant value, but when done incorrectly, it can also be disastrous 

Webinar: Project and Trade Management Musts—The New American Remodel 2023

Access the webinar here to learn project and trade management lessons from The New American Remodel 2023

How to Attach a Patio Roof to an Existing House

Discover expert tips on how to attach a patio roof to an existing house. Elevate your homeowner clients' outdoor living spaces with our comprehensive guide.

How To Improve Energy Performance in Existing Attics

There’s more to insulating the attic than attic insulation; there’s venting, air sealing, and misery

Model ReModel 2022: A Case Study in Sustainable, Thoughtful Construction

The eighth annual Model ReModel project features an accessory dwelling unit, designed for aging in place, attached to a 19th-century Victorian

Advertisement
boombox2
Advertisement
halfpage2
Advertisement
native1

More in Category




Advertisement
native2
Advertisement
halfpage1
Advertisement
leaderboard1