Wrapping a building with rigid insulation creates a tight thermal envelope that minimizes heat loss via conduction through the framing. At windows, it’s important to preserve that thermal break while also providing a solid nail base. David Joyce and his crew at Synergy Construction, in Lancaster, Mass., solved the problem on a recent deep energy retrofit on which they wrapped the building in two layers of 2-inch foam. After the first layer was installed, they framed the perimeter of window openings using 2-by material padded out with ½-inch plywood to match the 2-inch foam thickness. Here’s a step-by-step look at how they did it, adapted from a video at ProTradeCraft.com.
This top piece spans a series of three identical windows. Calvin and David (in the hat) have fastened each end and are using a straightedge to make sure the 2-by isn’t bowed in the middle, which could create alignment problems later when the trim is installed.
Damien applies pressure to straighten a side buck while it’s fastened to the frame with a 6-inch screw. Countersinks for the screwheads are created ahead of time using a spade bit.
Fastening the bucks with screws can compress the foam and create a wavy surface. Use a straightedge and tighten or backout fasteners as necessary to make sure the bucks are flat.
Next: Flashing the openings