Why Retrofit Foundation Footings?
It’s a result of the work on the home’s first floor that impacts the lower level. As it stands, the basement is barely tall enough for people to comfortably walk through.
So, the OA team plans to remove 19 inches of soil to drop the basement floor. This gives them the opportunity to transform the space into a comfortable living area with insulation and added heat.
But before any of that can happen, the remodeling team needs to retrofit footings to the existing foundation.
In ProTradeCraft’s first episode of Building Resilience season 3, “Basement Living Space Solution: Footing Retrofit and Structural Slab,” it’s outlined that the retrofit footing necessity comes from the lack of footings to begin with when the concrete foundation was poured 100 years ago.
Retrofitting the Foundation Footings
Step 1: The team digs (quickly) at a 45-degree angle away from the bottom of the foundation wall without disrupting the bearing capacity of the soil and dig an interior trench for drain tile
Step 2: To direct water into the drainage trench, the OA team covers the foundation wall with a dimple sheet.
Step 3: Styrofoam insulation is added under the spot where the interior footing curb will be, and then the OA team throws in some rebar in two directions.
Step 4: The concrete curb is poured. (Note from ProTradeCraft: In the real world, you need to build a form. And then strip it after the pour.)
Step 5: Prepare for styrofoam insulation under the soon-to-come slab by taping seams. Then the team lays down hydronic tubing for in-floor heat, which sits on top of the insulation.
Step 6: The slab is poured between the curbs.