flexiblefullpage
interstitial1
Currently Reading

How To Build Rot-Resistant Deck Beams

Advertisement
billboard
Jobsite Know-How

How To Build Rot-Resistant Deck Beams

Built-up deck beams create seams that collect water and inhibit drying. Using spacers between 2-bys creates an airspace that promotes drainage and speeds drying.


By By Sal Alfano April 2, 2019
Deck installation
By Christine Bird
This article first appeared in the April 2019 issue of Pro Remodeler.

When building a deck, a primary concern is the ability of the deck boards to resist water damage. The durability of the deck framing gets less attention, but is arguably more important. If decay weakens the posts and beams supporting the structure, then the condition of the deck boards is moot.

The most troublesome spot is the deck ledger, and we’ve featured a number of videos that discuss the best way to flash this connection to keep water away and allow for drying. Although deck support beams deserve the same attention, they don’t always get it. One exception is a video from Steve Maxwell, a home improvement contractor in Manitoulin Island, Ontario, Canada. 

The Problem

Most contractors use composite beams, nailing or bolting together two or three pressure-treated (PT) 2-bys on site [1]. Though plenty strong, the joint between members catches and holds water, so it takes longer for the wood to dry out. The seams also catch particles of sawdust, dirt, and debris that can further hinder drying.

The exception is a solid-sawn beam, which, as Maxwell notes, has a flat, joint-free surface that “sheds off harmlessly.” Yes and no: A solid beam would typically be 3 or 4 inches wide, or more—enough to hold water and also provide a collection point for moisture-holding debris. But the real reason solid-sawn beams are rarely used is, as Maxwell suggests, because they are “heavier, harder to handle, and not as easy to find” as PT 2-bys. I would add that even the PT variety are likely to warp and split as they dry out, wreaking havoc with the deck board fasteners and leading to callbacks to fix pops, splits, and uneven joints.

The Solution

Maxwell’s solution is to separate the individual members of a composite beam with spacers sized to match the full depth of the beam [2]. He typically cuts 2- to 3-inch-wide spacers from ½-inch PT plywood, but notes that composite material could also be used. The top of each spacer is cut at an angle, creating sloped edges that promote drainage.

Maxwell places the spacers at approximately 24 inches on-center, which corresponds to the fastener spacing interval. He recommends using carriage bolts instead of nails because they do a better job of drawing the “sandwich” together [3]. He doesn’t say what diameter he uses, but ¼-inch bolts are larger than the 20d or 30d nails that would otherwise be used. If you like to use washer-head structural screws for built-up beams, they will work in this case as well. However, unlike bolts, with screws you will be better able to draw the individual 2-bys together if you work from both sides.

These days, many deck builders solve the moisture problem by capping beams—and sometimes the joists as well—with peel-and-stick tape. Depending on the size of the deck, this can get expensive in both material and labor, but it’s a good solution for flush beams and complex framing intersections. A combination of tape and spacers might be a good compromise solution.

One place spacers clearly make sense is at the perimeter of a deck between the rim joist and the fascia [4]. The airspace created keeps debris from collecting and promotes drying by allowing for air movement. 


written by

Sal Alfano

Executive Editor

Sal Alfano is executive editor for Professional Remodelersal.alfano@gmail.com, 202.365.9070


Add new comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and email addresses turn into links automatically.
  • Lines and paragraphs break automatically.
leaderboard2

Related Stories

How to Weatherize Roof-Wall Intersections

Mitigating moisture between changes of materials and panes requires special attention

3 Steps for Installing House Wrap and a Rainscreen

ProTradeCraft's Building Resilience walks you through how to install a self-adhered house wrap, liquid flash obstructions, and top it off with a rainscreen

How to Insulate a Heated, Structural Slab with XPS

ProTradeCraft's Building Resilience season three starts with making a basement more comfortable

How to Retrofit Foundation Footings

To make a low-height basement a more comfortable living space, this remodeler digs deeper but needs to add support to do so

6 Must-Knows for Installing Pocket Doors

Save your sanity: Do it right the first time

Crawl Spaces to Basements: Proceed with Caution

Converting a crawl space to other uses can upgrade a home and add significant value, but when done incorrectly, it can also be disastrous 

The Ins and Outs of Pedestal Tile Systems

A non-exhaustive overview of all things pedestal tile systems

How to Attach a Patio Roof to an Existing House

Discover expert tips on how to attach a patio roof to an existing house. Elevate your homeowner clients' outdoor living spaces with our comprehensive guide.

6 Tips for Electric Floor Heating Systems

These quick tips and tricks provide a base knowledge to begin your floor heating education

How To Improve Energy Performance in Existing Attics

There’s more to insulating the attic than attic insulation; there’s venting, air sealing, and misery

Advertisement
boombox2
Advertisement
halfpage2
Advertisement
native1

More in Category




Advertisement
native2
Advertisement
halfpage1
Advertisement
leaderboard1