This guide—taken from content on Protradecraft.com—shows how a remodeler retrofits footings then insulates the slab.


July 22, 2024
This article first appeared in the July/August 2024 issue of Pro Remodeler.

Remodeler Michael Anschel of OA Design+Build+Architecture wants to provide a resilient, comfortable, and beautiful new basement in this 100-year-old Minneapolis home. To do so, he wants to ensure he gives these homeowners a well-insulated sub slab. (He even goes the extra mile to plan for hydronic tubing for a heated floor.)

The remodeling work being done on the home’s first floor made this project necessary. The first floor work resulted in major structural changes, which then resulted in needing to replace the primary footings used to hold the central bearing beam of the home.

“And to do that was pretty easy. We cut open the slab, we dug down some ways, we poured a new footing, and we were able to replace all of that,” explains Anschel. “When it comes to the perimeter though, it gets a lot more challenging.”

The foundation had no footing underneath, so the team must retrofit some.

Then come the fun parts: insulating and heating.

 

Why Retrofit Footings?

It’s a result of the work on the home’s first floor that impacts the lower level. As it stands, the basement is barely tall enough for people to comfortably walk through. 

So, the OA team plans to remove 19 inches of soil to drop the basement floor. This gives them the opportunity to transform the space into a comfortable living area with insulation and added heat.

But before any of that can happen, the remodeling team needs to retrofit footings to the existing foundation.

 

Retrofitting Footings

basement footings
1. The team dug a 45-degree angle away from the bottom of the foundation wall to ensure no disruption of the bearing capacity of the soil, then they dig  an interior trench for the drain.

 

retrofit footings
2. To direct water into the drainage trench, the OA team covers the foundation wall with a dimple sheet.

 

retrofit footings
3. Styrofoam insulation is added under the spot where the interior footing curb will be, and then the OA team throws in some rebar in two directions.
retrofit footings
4. The concrete curb is poured. (Note from ProTradeCraft: In the real world, you need to build a form. And then strip it after the pour.)
retrofit footings
5. The team slid polystyrene insulation under the rebar. Once in place, the team then tapes the seams.

 

retrofit footings
6. The slab is poured between the curbs.

Insulating The Slab

Project architects selected expanded polystyrene insulation (EPS) rather than extruded polystyrene (XPS). EPS is better environmentally, but it’s outperformed by XPS when placed under the slab.

The team went with DuPont’s new XPS, the ST-100 Series. It’s a low global warming potential (GWP) product that meets the needs of the install: 25 PSI and a 0.1% water absorption.

Dissecting Under the Slab

Before adding the insulation, the team sets a smooth layer of crushed rock, ¾-inch in diameter or larger, on top of the sand. On top, the team places two inches minimum of the XPS insulation. These are slipped under bent up rebar. On top, the team places a plastic sheet.

An important factor of the layer, Anschel points out, is the capillary break—the crushed rock.

“And the reason that works so well is while sand particles are really close to each other, water can work its way up through the sand,” he explains. “But with the crushed rock, the voids are too large for water, which is fairly sticky stuff, to work its way up. So, the rock is your capillary break.”

After placing the XPS, which creates a smooth foundation for the next trades, the team checks the elevation of the sheet with a laser. They continue this process until they cover the entire floor, working with large perimeter sheets and cutting sheets to fit into those tricky spots.

 

Installing Floor Heating

Before the team staples the hydronic tubing in place, the seams between XPS sheets are taped. This helps the slab cure slower.

While the plumbers installed tubing under the slab, they also went ahead and stapled hydronic tubing under the first floor, the basement ceiling.

heating the floor
To heat the first floor, the team staples hydronic tubing on the basement sealing to the joists. Then comes a radiant barrier and insulation.

 

ProTradeCraft outlines that the tubing is stapled into the joists about two inches below the subfloor. A reflective bubble wrap radiant barrier will work to reflect heat into the subfloor. Friction fitting in styrofoam insulation between the joists restricts heat flow. It’s then all covered in drywall.


Add new comment

Plain text

  • No HTML tags allowed.
  • Web page addresses and email addresses turn into links automatically.
  • Lines and paragraphs break automatically.
leaderboard2

Related Stories

3 Areas Successful Remodelers Focus On

Industry advisor Mark Richardson shares what separates the losing from the winning in today’s market

Peppermill Finish

New for 2024, Peppermill brings a darker brown with a grey undertone to the table that coordinates well with lighter colors. This gorgeous stain adds…

NAHB: Remodelers Face Challenges and Opportunities

Remodelers face a uniquely strong market yet remain challenged by codes and costs

Selling Your Company to Your Team

From company valuation to terms of the transfer, here’s a look at how three different remodelers made the deal work

Re-Bath Expands its Reach with New Franchise

The company signs a deal with brothers who are first-time franchisees

Pro Remodeler’s 2024 Pinnacle Experience Reaches New Heights

The sold-out event covered leadership, lead gen, sales, and technology

Brian Gottlieb Receives Remodeling Mastery Award

Presented by industry icon, Mark Richardson, the award celebrated Gottlieb’s extraordinary impact on remodeling

What's Beyond the Hammer?

Working with Brian Gottlieb on the book Beyond the Hammer provided a masterclass on how to build an aligned team 

5 Counterintuitive Strategies to Improve Your Business

Follow these strategies to inspire employees, instill trust, and beat the competition

Couple Act As Much More Than General Contractors

How LBR Partners uplifts and educates their Spanish-speaking trade partners

Advertisement
boombox2
Advertisement
halfpage2
Advertisement
native1

More in Category




Advertisement
native2
Advertisement
halfpage1
Advertisement
leaderboard1